Maucks Pond Bridge, SR 64

Located in Princeton, Indiana adjacent to the IL5/ SR64 bridge project, the Maucks Pond bridge demolition package required the removal of the main steel structure, piers, en-bents, foundations, and associated concrete for Crider and Crider. Company owned hydraulic excavators and universal processors cut and downsized the steel and pulverized the concrete structures. Onsite concrete was recycled at a local power plant as road building material.